Product Specs
| Dimensions (L*W*H)": | (85*75*94.5)" |
| Interior Dimensions (L*W)": | (78.6*68.4)" |
| Door Size: | W33" × H78" |
| Net Area: | 37.3 ft² |
| Frame: | Q235 Steel |
| Surface Coating: | High-Temperature Resistant Paint |
| Roof Material: | PVC Ceiling Board + Fireproof Insulation Foam Board |
| Wall Material: | 2-Inch EPS Fire-Resistant & Insulated Wall Panels |
| Floor Material: | Anti-Skid And Wear-Resistant Floor Leather + Hard PVC Board |
| R-Value: | 7.09~8.27 |
| Doors: | EPS Composite Panel, Inward Opening Door |
| Circuit Breaker Spec: | 13~16 Amps |
| Power Supply: | 110V~220V |
| Wire Info: | 3 Core 2.5 sqmm |
| Wiring Instructions: | White Wire: Live Wire; Black Wire: Neutral Wire; Green or Yellow-Green Wire: Earth Wire |
| Flush Volume: | 1.6 GPF |
| Inlet Pipe: | ½" PEX Pipe |
| Drain Pipe - Black Water: | 3" PVC Pipe |
| Drain Pipe - Gray Water: | 1-½" PVC Pipe |
| Lowest Pipe Working Temperature: | 14℉ (If Iced, Please Use 122℉ Water To Melt) |
| Fire-Proof Level: | B2 |
| Wind Load: | 40 Miles/H |
| Snow Load: | 125 LBS/SQ FT |
| Forklift Pockets: | Dimension: W7" × H3", Distance Between Pockets: 28" |
| Shipping Dimensions (L*W*H)": | (75*85*95)" |
| Shipping Weight: | 1,941 LBS |
| Unloading Requirement: | A Forklift Or Equivalent Is Required For Unloading |
| Installation Requirements: | The Customer Must Arrange For A Licensed Electrician To Supply And Install All Wiring. All Pipe Connections Need Thread Seal Tape Instead Of Glue To Seal Them. |
| Water & Sewage Requirements: | Portable Restrooms Must Be Supplied With City Water Or Well Pump Water, And All Sewage Must Be Connected To The City Sewer System Or A Basic Septic System. |
| Construction Site Recommendation: | For Construction Sites, Connect Toilets To The Sanitary Sewer System And Connect Water To The Pipe System. Otherwise, External Waste Tanks May Be Required. |
